24
Annual Report
2013
Ratchaburi Power Plant successfullymaintained its
high standard of environmental management under
ISO 14001 and standard of occupational health and
safety under OHSAS 18001: TIS18001. The power plant
efficiently keeps its impact on the environment below
the level allowed by such international standards and
achieved 1,740,000 safety man-hours without lost
time injury accident. It is expected that it will achieve
2 million safety man-hours in early 2014.
4. PTO-A Power Plant,
Ratchaburi Energy Company Limited
The power plant has already passed ISO
9001:2008 Surveillance Audit for the year 2013 since
28 February 2013. The power plant has been certified
since 2011
5. Sao Thian Power Plant,
Ratchaburi Energy Company Limited
Sao Thian Power Plant is awaiting for the
certification of ISO9001:2008whichwill be proceeded
in 2014.
Projects Under Construction and
Development
1. SPPs Projects, Ratchaburi World
Cogeneration Company Limited
Is in the process of finding engineering,
procurement and construction (EPC) contractor
for the electricity distribution system and steam
pipeline system for industrial customers, power plant
construction and natural gas pipeline construction.
2. Small Power Producer (SPP) Project:
Nava Nakorn Electricity Generating
Company Limited
Is under the process of selecting contractors for
design, supply and constructionof power plant aswell
as preparation of Environment Impact Assessment of
natural gas distribution pipeline connecting to the
project.
Renewable Projects In Thailand
Commercially Operating Power Plants
1. Solar Power Plants
In 2013, the solar power plants under Solar
Power (Korat 3) Company Limited, Solar Power
(Korat 4) Company Limited and Solar Power (Korat
7) Company Limited have smoothly been operated
and when the construction was completed in 2012
they have been able to distributed full electricity as
required under the power purchase agreement.
2. Huay Bong 3 and Huay Bong 2
Wind-Turbine Power Projects
The Huay Bong 3 Wind Turbine Power Project
by First Korat Company Limited, and Huay Bong 2
Wind Turbine Power Project by K.R. Two Company
Limited have began commercial operations and
distributed electricity according to the power
purchase agreements with EGAT, starting from
14 November 2012 and 8 February 2013 respectively.
3. Solar Power Plant, Solarta Company Limited
All 8projects havebeenoperating commercially
since 2012. Located in Phra Nakhon Sri Ayutthaya,
Nakhon Pathom and Supanburi provinces, all the
power plants have introduced the ISO 9001 standard
in its operations to increase work efficiency. They
are registered as Clean Development Mechanism
(CDM) projects under the United Nations Framework
Convention n Climate Change (UNFCCC) and reduce
carbon dioxide emission by 35,000 tons per year. CDM
projects have been continually improved in order to
achieve the Gold Standard CDM, the world’s highest
carbon credit quality at the moment.
Solar Power’s Power Plant